Fishheadbarandgrill
Elio Fan
- Joined
- Jul 25, 2014
- Messages
- 17
- Reaction score
- 41
Your statement about the ATVM is no longer correct; Paul has stated they can go to production without the ATVM loan; however the ATVM loan does make it easier. That loan also goes to vendors and not to EM.
To build the 100 can be done in less than a week; they area going to be built at the factory.
The factory is expected to build 500 a day with a single shift, 1,000 a day with two shifts when at full speed. So 100 in a week should be very possible.
I agree that Paul has said that. I just don't think he has a viable path to the funds without the loan. The pace of his progress is slow enough to continue to court private investors while popping our E Series vehicles at a snails pace. That might be his strategy, which isn't necessarily a bad thing. I'd rather have in my garage the vehicle we see today than the vehicle we saw in 2014.