I need to figure out a way to get that link in a sticky with a disclaimer saying it's an absolute, etched in stone GUESS-tamator for the calculated date.The official line is still "Q4 2016". Somebody put together a manufacturing rate estimation tool at this thread, and if we enter your SIL with an estimated production start date of November 1, 2016, then the tool spits out... (drum roll) ... between 2/21/2017 and 3/6/2017.
Here is a direct link to the website with the tool.