ecdriver711
Elio Addict
- Joined
- Mar 1, 2014
- Messages
- 1,351
- Reaction score
- 2,908
Production Plan. Our Vice President of Manufacturing and Product Launches, Gino Raffin, and our consultant for project
management of Shreveport operations have developed the production plan and facility layout. The facility layout has been developed to
utilize the existing infrastructure and flexible design of the buildings at the Shreveport facility. A detailed 47-week launch plan has been
developed, which includes 24 weeks of pre-production activities, 10 weeks of manufacturing validation and training, and 12 weeks7 of
increased production to reach optimal production output. Incorporated into the launch is the plan that the first 125 vehicles produced
will not be sold, but utilized for internal purposes.
So really EM would not need to begin this plan till January.