Rather than asking about, for instance, the "status on the P5", ask if the frame has been completed. If you just ask for a status, they can just say "It is in work". If you ask if the frame has been completed, they either say "Yes" or "No". I'd personally like to know if the frame design has been finalized and if they will now be able to make E01-E25 from that design. (It won't take long to duplicate what has already been done and if they are at a point where they are building the next 25 frames, it means they know the P5 frame is good and the only way they'd know that is if they were beyond the point of seeing if everything that bolts to the frame will work.)A supplier summit is planned Aug. 13-14 in Detroit.
You would think Detroit would be a little anti-Elio since final assembly happens in another state. But most of the suppliers are in Detroit and all across the US.
So the current issue is what will be announced, if anything, after this summit. Here's the tickler source;
http://www.shreveporttimes.com/story/news/2015/07/27/times-interviewing-paul-elio/30561561/
What we are hoping for ...
1) Description of the updated 'Funding Picture'. Frankly we want to know what's been enabled.
2) Accurate projection of the production schedule. Ok, will settle for a expectation and confidence level? Maybe, but we'll gripe about it.
3) Status of the P5 (, E1 or whatever ), expected completion etc.
4) Same as 3 for the E2-25
5) Status of engine testing and current specs.
6) Details about pilot production of engines, count, destination for use, etc.
anything else?
Something else I've wondered about -- is the engine finalized enough that they are ready to begin producing them for their test vehicles?