A supplier summit is planned Aug. 13-14 in Detroit.
You would think Detroit would be a little anti-Elio since final assembly happens in another state. But most of the suppliers are in Detroit and all across the US.
So the current issue is what will be announced, if anything, after this summit. Here's the tickler source;
http://www.shreveporttimes.com/story/news/2015/07/27/times-interviewing-paul-elio/30561561/
What we are hoping for ...
1) Description of the updated 'Funding Picture'. Frankly we want to know what's been enabled.
2) Accurate projection of the production schedule. Ok, will settle for a expectation and confidence level? Maybe, but we'll gripe about it.
3) Status of the P5 (, E1 or whatever ), expected completion etc.
4) Same as 3 for the E2-25
5) Status of engine testing and current specs.
6) Details about pilot production of engines, count, destination for use, etc.
anything else?
You would think Detroit would be a little anti-Elio since final assembly happens in another state. But most of the suppliers are in Detroit and all across the US.
So the current issue is what will be announced, if anything, after this summit. Here's the tickler source;
http://www.shreveporttimes.com/story/news/2015/07/27/times-interviewing-paul-elio/30561561/
What we are hoping for ...
1) Description of the updated 'Funding Picture'. Frankly we want to know what's been enabled.
2) Accurate projection of the production schedule. Ok, will settle for a expectation and confidence level? Maybe, but we'll gripe about it.
3) Status of the P5 (, E1 or whatever ), expected completion etc.
4) Same as 3 for the E2-25
5) Status of engine testing and current specs.
6) Details about pilot production of engines, count, destination for use, etc.
anything else?