As the excitement builds up for the eventual P5 reveal this November followed by the 25+ engineering series which no one knows if funding has been secured to build it- will EM have enough time to get everything in place to finally start production by 4th quarter of 2016 as being advertised right now? Or are they facing yet another delay? It is our hope that if they ever get to the point of actually start testing these E series, everything holds up the way they're designed and engineered to perform per their computer simulations. Hope for the best, prepare for the worst as the saying goes, if "some" tests do not meet their expected results, it's back to the drawing boards for more adjustments, refinements, etc. which will cost more money and more delays! IMHO, 2016 is a long shot but not entirely impossible. Infusion of funding will decide but no guarantees how soon production will begin.